U.S. CARE® — Fire Curtain Inspection and Maintenance
PER NFPA 80, CHAPTER 22 & MANUFACTURER'S OPERATING AND MAINTENANCE GUIDELINES
NFPA 80 requires opening protectives to be inspected and tested annually — a deployed-and-verified drop test, not a visual check. U.S. CARE® is our preventative maintenance program: scheduled inspections, drop testing, and documentation for your AHJ, performed by the people who built the system.
— PROGRAM SCOPE
What the program includes
- Annual drop test
- Motor and controller check
- Fabric and bottom bar inspection
- Sensor verification
- Written compliance report
PROGRAM TIERS AND PRICING IN PREPARATION — CONFIRM SCOPE AT EXT. 101
— CODE
Why annual inspection is not optional
NFPA 80, Chapter 22, and the manufacturer's operating and maintenance guidelines require it, and your AHJ will ask for the documentation. A deployed-and-verified drop test with a written report is what satisfies both.
— SERVICE DETAIL
Our 39-point electrical and mechanical service includes
- 01Check all fuses
- 02Check back-up power supply
- 03Check voltage at MC positive loop at CP — retracted state
- 04Check voltage at MC positive loop at CP at deployment
- 05Check voltage at MC negative loop at CP — retracted state
- 06Check voltage at MC negative loop at CP at deployment
- 07Check motor supply in / out at MC out
- 08Check line voltage supply in / out
- 09Check transformed voltage & transformer — retracted state
- 10Check transformed voltage & transformer at deployment
- 11Check voltage at CP — retracted state
- 12Check voltage at CP at deployment
- 13Check loop voltage for short degradation
- 14Test key switch contact to fire alarm circuit
- 15Check delayed reset control
- 16Check mains failure, all trouble lights & annunciator
- 17Check (Bldg. Mgmt. System) BMS
- 18Spray anti-static printed circuit board (PCB)
- 19Spray PCB board for dust collection
- 20Test override & test grounds
- 21Check accessible wiring terminations
- 22Grease all contacts
- 23Lubricate side rails & housing — check for obstruction
- 24Adjust curtain fabric tabs and bottom bar
- 25Inspect curtain fabric for damage
- 26Inspect bottom bar for damage
- 27Inspect push buttons for damage
- 28Bottom bar fabric slack removed
- 29Obstruction of bottom bar
- 30Bottom bar sits flush with headbox
- 31Obstruction of headbox
- 32Obstruction of side rails — opening must be no less than 1/2 inch
- 33Apply fire coating as necessary
- 34Verify all labels are installed in the correct locations
- 35Cycle curtain system for efficient and safe operation per NFPA 80 guidelines
- 36Curtain deployment test — Cycle 1
- 37Curtain retraction test — Cycle 1
- 38Curtain deployment test — Cycle 2
- 39Curtain retraction test — Cycle 2